A schema migration is the one deployment step that is not trivially reversible. Code can be rolled back in seconds; a dropped column cannot. The two failure modes that cause almost every migration incident are the same every time: a lock held long enough to stall the application, and a schema change deployed in the wrong order relative to the code that reads it. This checklist is built around avoiding both.

1. Expand and contract planning

  • The change is decomposed into expand, migrate, and contract phases — expand adds the new structure without touching the old, the application is moved over, and only then does contract remove the old structure. Every phase ships and is verified separately.
  • Expand-phase changes are purely additive — new nullable columns, new tables, new indexes. Nothing existing is renamed, retyped, dropped, or given a constraint that current writes could violate.
  • A rename is never done in place — add the new column, dual-write to both, backfill, switch reads, stop writing the old, then drop it. An in-place rename breaks every running instance of the old code the instant it commits.
  • Dual-write logic is behind a flag with a defined removal date — it is temporary scaffolding, and a permanent dual-write is a permanent source of divergence between two columns.
  • The contract phase is a separate deployment, after the previous release is confirmed irreversible — dropping a column while a rollback to the previous version is still plausible converts one incident into two.
  • Each phase has been checked for whether it can be safely paused indefinitely — real releases stall, and every intermediate state must be a state you can live in for a week.
  • The full sequence is written down in order, with the deploy that accompanies each step — this is the artefact the release runbook needs, not the migration file itself.

2. Backward compatibility during rolling deploys

  • Old code runs correctly against the new schema — during a rolling deploy, and for the entire duration of any canary, both versions are live at once and both are serving writes.
  • New code runs correctly against the old schema — the migration and the deploy are not atomic, and either can land first depending on your pipeline.
  • New columns are nullable or have a database default — adding a NOT NULL column with no default fails immediately for the old code, which does not know to supply it.
  • SELECT * is not used on tables being changed — column addition or reordering silently changes the shape of the result set for ORM code that positionally maps rows.
  • New constraints are added as not-valid first, then validated separately — on PostgreSQL, ADD CONSTRAINT ... NOT VALID followed by VALIDATE CONSTRAINT avoids a full-table scan under an exclusive lock.
  • Enum and lookup values are added before any code emits them, and removed only after no code emits them — this is the same expand/contract discipline applied to data.
  • Application-level compatibility is actually tested, not reasoned about — run the previous release’s test suite against the migrated schema in CI.

3. Locking and large tables

  • The lock each statement takes has been looked up for your specific engine and version — the answer differs between PostgreSQL and MySQL, and between versions of each; assume nothing from experience on the other one.
  • The migration acquires no lock that blocks writes for more than a second or two on production-sized data — a table rewrite on a large table stalls every connection queued behind it, exhausts the pool, and takes the application down even though the database is technically healthy.
  • Indexes on large tables are built concurrentlyCREATE INDEX CONCURRENTLY on PostgreSQL, or the engine’s online DDL equivalent, and note that concurrent index builds cannot run inside a transaction block.
  • A lock_timeout (or equivalent) is set so the migration fails fast rather than queueing — an ungranted ACCESS EXCLUSIVE lock request blocks every subsequent query on that table, including reads, turning a slow migration into a total outage.
  • Long-running transactions and idle-in-transaction sessions are checked for before starting — a single open transaction from an analytics query will block the lock acquisition indefinitely.
  • The migration has been timed against a production-sized copy — the row count in staging is not evidence about anything.
  • An online schema change tool is used where the engine cannot do it natively — and its trigger or replication overhead has been accounted for in the maintenance window.
  • Replication lag impact is estimated — a migration that replays serially on replicas can push read replicas minutes behind and break read-after-write assumptions.

4. Backfills

  • Backfill is separated from the DDL migration — mixing a multi-million-row UPDATE into a schema migration holds locks and blocks the deployment pipeline.
  • The backfill runs in bounded batches with a pause between them — commit each batch, keep transactions short, and leave headroom for production traffic.
  • The backfill is resumable and idempotent — it will be interrupted, and restarting from zero on a large table is often not affordable.
  • Backfill progress is observable — rows remaining, current rate, and estimated completion, so someone can decide whether to let it run or stop it.
  • The backfill has a kill switch and its effect on database load is monitored while it runs — watch replication lag, lock waits, and IO saturation, not just CPU.
  • New writes populate the new column while the backfill is in progress — otherwise the backfill can never converge.
  • Completion is verified by a count of remaining unpopulated rows, not by the job exiting zero.

5. Rollback safety

  • The rollback path is written and tested, not assumed — for each migration, either a tested down-migration exists, or the migration is documented as forward-only with the reason.
  • Every step is classified as reversible or irreversible before the release — dropping a column, dropping a table, and narrowing a column type are irreversible regardless of what the down-migration file claims.
  • A down-migration that recreates a dropped column is marked as data-lossy — restoring the structure without the data usually leaves the application worse off than the failure it was meant to fix.
  • A backup or snapshot taken immediately before the migration is verified to exist — and the restore time for the current data volume is known and acceptable.
  • The rollback plan states what happens to data written by the new version — if the new code wrote rows the old code cannot interpret, rolling the code back does not roll the data back.
  • Rollback has been rehearsed at least once on a non-production environment with production-like data.
  • The point of no return is identified explicitly in the runbook — the step after which rolling forward is the only option, so nobody discovers it during an incident.

6. Correctness of the change itself

  • Column types match the data’s real domain — check maximum length, precision for decimals, and whether a 32-bit integer key will exhaust; an identifier column approaching its maximum is a well-known outage cause.
  • Timestamps use a timezone-aware type and store UTC — retrofitting timezone handling onto a populated column is a migration nobody enjoys.
  • Foreign keys and their cascade behaviour are deliberateON DELETE CASCADE on a large table can delete far more than intended and hold locks while doing it.
  • Every new index is justified by a query, and the query plan has been checked with EXPLAIN on realistic data — redundant indexes slow every write and consume storage forever.
  • Uniqueness that the application relies on is enforced by a database constraint — application-level checks lose to concurrency.
  • Default values are considered for their effect on existing rows — on older engines, adding a column with a default rewrites the whole table.
  • Character set and collation match the rest of the schema — a mismatched collation on a join column silently disables index usage.

7. Testing and review

  • The migration has been run against a restored copy of production data — anonymised if necessary, but with real row counts and real data distribution.
  • The migration runs cleanly from an empty database as well — the whole migration history must still build a working schema for new environments and for CI.
  • Running the migration twice is safe or is prevented — a partially applied migration will be retried, and the retry must not fail on the half that succeeded.
  • The migration is reviewed by someone who has operated this database — schema review is a different skill from code review, and reviewers who only read the diff miss lock behaviour entirely.
  • Automated linting for unsafe migration patterns runs in CI — several tools catch non-concurrent index creation, in-place renames, and NOT NULL additions without defaults.
  • The generated DDL has been read, not just the ORM migration source — framework migration DSLs regularly emit something other than what the author intended.
  -- Expand: additive, no rewrite, no blocking lock.
ALTER TABLE orders ADD COLUMN customer_uuid uuid;
CREATE INDEX CONCURRENTLY idx_orders_customer_uuid ON orders (customer_uuid);

-- Later release, after the backfill has converged and reads have switched:
ALTER TABLE orders
  ADD CONSTRAINT orders_customer_uuid_not_null
  CHECK (customer_uuid IS NOT NULL) NOT VALID;
ALTER TABLE orders VALIDATE CONSTRAINT orders_customer_uuid_not_null;
  

8. Execution and monitoring

  • The execution window avoids peak traffic and any scheduled batch job — including the nightly export nobody remembers owning.
  • Someone with production database access is present while the migration runs — not merely reachable.
  • Lock waits, active query count, replication lag, and error rate are watched live during execution — with an agreed threshold at which the migration is aborted.
  • The abort procedure is known before starting — how to cancel the statement, and how to terminate the backend if cancelling does not work.
  • Migrations run as a distinct database role from the application — the application should not hold DDL privileges at runtime.
  • The migration is applied by the pipeline, not by hand from a laptop — with the exception path documented for emergencies.
  • Post-migration verification is defined in advance — the specific queries, counts, and dashboards that confirm success, checked before the change is declared done.

Sign-off

AreaReviewerDateOutcome
Expand and contract planningPass / Pass with actions / Fail
Backward compatibility during rolling deploysPass / Pass with actions / Fail
Locking and large tablesPass / Pass with actions / Fail
BackfillsPass / Pass with actions / Fail
Rollback safetyPass / Pass with actions / Fail
Correctness of the change itselfPass / Pass with actions / Fail
Testing and reviewPass / Pass with actions / Fail
Execution and monitoringPass / Pass with actions / Fail

Anything in the rollback safety or locking sections that is not a clear pass should block the release rather than becoming a follow-up ticket.